Commercial operation in the Monor Solar Power Plant of ALTEO started in December 2018. The facility has a nominal capacity of 4 MW and uses a total of 17,072 pieces of 285 W polycrystalline solar cells, and is ALTEO’s first self-implemented solar park which consists of eight solar power plant units of 499 KW each.

The electricity produced will be sold in the mandatory offtake system (KÁT) for 25 years, based on a permit issued by the Hungarian Energy and Public Utility Regulatory Authority.